The Stockport Mill Inn is located on
the west end of the dam at Lock 6 on the Muskingum River - an ideal location
for a hydroelectric power plant. The
original turbines were too corroded to be restored; however one is on
display at the
Mill. The current
turbines are rebuilt 40" Leffel Sampson turbines, like the ones
originally used in the mill's grain operations.
These turbines are the 'improved' 1913 design and weigh about 6200
pounds each. They are identical
to the ones on display, except they have new stainless steel parts (the
original turbines used regular carbon steel which easily rusted, hence the
corrosion). The two turbines in
use and the one on
display were rebuilt from the parts of four old rusting turbines - one came
from the Mill, one from Michigan, and two from Wisconsin.
The original turbines used wooden bearings made of Lignum Vitae wood,
the world's hardest and densest wood. The
rebuilt turbines use a thrust bearing in the speed increaser instead, and a
guide bearing on the turbine, which is made of Thordon, a special elastimer
bearing material.
The turbines can produce a maximum of 134
horsepower each, at the maximum water head at Stockport (the difference in
elevation between the upper and lower pool of the dam).
The Stockport Dam has a maximum head of about 12.6 feet.
Water enters through the trashrack and into the forebay.
The trashrack keeps floating logs from the river out of the turbines.
The water then moves from the forebay into the turbine pit
through a
tunnel in the foundation wall which is 8' x 8'.
The water then enters the turbines from the side when the 12 gates are
opened. The water hits the
‘runner’, which turns and makes the power.
The water is then discharged through the bottom of the turbines, which
is called the 'draft tube', into the cavity under the turbine pit.
The water then
exits through the tailrace (large opening in the South side wall of the Mill)
and back into the lower pool of the river.
The only way the water can get from the turbine pit to the lower pool
of the river is through the turbines and into the tailrace.
The turbines run at about 140 revolutions
per minute (rpm). The turbine
shaft is connected to the Speed Increaser (yellow) built by Byrne Gear of
Mansfield, OH. The Speed
Increaser is a two stage planetary gear box that increases the shaft speed by
a factor of 13 times, to 1820 rpm, which is the speed of the generators.
The Generators (blue) sit on top of the Speed Increasers and are up
this high to be above the 100-year flood level (meaning that flood water get
this high on average once every 100 years).
The control box is also at this height for the same reason.
The Generators are 'induction' generators
that have a nameplate rating of 100 kilowatts, and were built by Marathon
Electric of Wausau, Wisconsin. The
two generators will produce about 800,000 kilowatt-hours per year. The power output varies according to the water levels in the
upper and lower pools, and the difference between the two (the head).
The system can produce all the power the Mill needs and the surplus is
sold to the local utility (AEP). This
system was the second Distributive Generation system hooked up to AEP under
the new deregulation plan.
The turbines each use about 1000 gallons of
water per second or 2000 gallons per second for both.
That works out to about 7 million gallons of water each hour.
Even so, this is on average only about 4% of the flow in the Muskingum
River.
The yellow boxes located next to the
Generator/Speed Increasers are the reservoir, circulator pumps and oil coolers
for the oil that is constantly being circulated through the Speed Increasers.
The orange boxes with handles are the actuators that open and close the
turbine gates.
A computer called a Programmable Logic
Controller (PLC) runs the entire system.
If the system detects any problems with the generators or the electric
grid that it is connected to, the system will switch to an emergency battery
power supply, which automatically shuts the gates and stops the turbines.
In 2003, both turbines were severely
damaged and fell silent. The damage was caused from debris inside the
forebay.
The Mill was sold in July 2004. The
new owner found the turbines silent and badly bruised. After several
months of evaluating the business situation, she contacted the original
engineer on the Hydro Project, who then directed her son-in-law through the
rebuild of the antique turbines. Making many parts himself and after
months of tedious labor, both turbines were restored to pristine condition.
in November 2006, the turbines, once again, began the mighty job of powering
the hotel & restaurant at Stockport Mill Inn.